Longhorn Substation
2024 BPA Secondary Capacity Model (SCM) project. WESCO was the buyer. QB fabricated pedestal insulators, 230kV and 500kV dead-end towers, a tower bridge, and disconnect switch and support equipment.
- The Challenge
- Tight integration window with engineering, civil and electrical scopes on an active utility site.
- QB Scope
- Sole steel fabricator. Coordinated submittals, trial-fit verified critical assemblies and staged delivery to match field installation order.
- Field Outcome
- On-spec, on-schedule delivery with zero field rework on bolted connections.